7/3/2023 0 Comments See finance user guide pdfOnly if the grant has an allocation from the Global fund for COVID-19 (C19RM) activities, can a second output be added within the existing project.Ītlas allows other donor funding, including UNDP core funding, to be combined with the Global Fund funding. Projects created in Atlas should conform to the standard structure that one Global Fund Grant Agreement corresponds to one Atlas Project with one Atlas Output.Ĭountry Offices (COs) should not create multiple outputs for one grant as this complicates cash management and cash reconciliation reports in Atlas. Global Fund project/budget setup in Atlas should adhere to the following principles: The financial control on budgets in Atlas (income, expenses, advances, etc.) is at the output level and NOT at the Project (Award) level. Therefore, there may be one Project (“Award” in Atlas) with different Outputs (“Projects” in Atlas). It is important to remember that the term “Project” in UNDP policy represents the project document, previously known as an award in Atlas and the term “Output” is represented by a “Project” in Atlas (the budget is at the level of the Output). This includes guidance on how to ‘Formulate Programmes and Projects’, ‘Select Responsible Parties and Grantees’and ‘Appraise and Approve’. UNDP’s standard procedures as advised in UNDP Programme and Operations Policies and Procedures (POPP) - Project Design should be followed for Global Fund project and budget formulation.
0 Comments
Leave a Reply. |